25 completed assignments at PrJSC Kryvyi Rih Cement plants, documented between 2019 and 2021.
25projects in our portfolio
COMPLETED WORK / 2019—2021
201901
202015
202109
202109 projects
№EQUIPMENT & SCOPE OF WORKCLIENT
17
Replacement of crane runway rails at the outdoor raw material storage yard.
PrJSC Kryvyi Rih CementKryvyi Rih plant
18
Replacement of crane runway rails at the combined storage facility.
PrJSC Kryvyi Rih CementKryvyi Rih plant
19
Overhaul of the VRS-134M railcar tippler and T 16-3 railcar pusher.
PrJSC Kryvyi Rih CementKryvyi Rih plant
20
Overhaul of bucket conveyors Nos. 21 and 22, including replacement of the bucket-chain assemblies.
PrJSC Kryvyi Rih CementKryvyi Rih plant
21
Overhaul of the BW-G800-360-4 bucket elevator serving the kiln cyclone preheater.
PrJSC Kryvyi Rih CementKryvyi Rih plant
22
Overhaul of the kiln induced-draft fan, impeller diameter 3,530 mm.
PrJSC Kryvyi Rih CementKryvyi Rih plant
23
Overhaul of the kiln electrostatic precipitator, model УГ 3-3-88.
PrJSC Kryvyi Rih CementKryvyi Rih plant
24
Overhaul of the kiln cold gas cleaning bag filter LJP29147-2x8, including replacement of filter bags.
PrJSC Kryvyi Rih CementKryvyi Rih plant
25
Refractory gunning of the 4.5 × 80 m rotary kiln, main kiln burner, clinker cooler, precalciner burner, cyclone preheater swirl chamber and 2.5 × 25 m tertiary air duct.
PrJSC Kryvyi Rih CementKryvyi Rih plant
202015 projects
№EQUIPMENT & SCOPE OF WORKCLIENT
02
Overhaul of cement mill No. 3, including replacement of the tubular screw conveyor and wear-resistant lining.
PrJSC Kryvyi Rih CementKryvyi Rih plant
03
Overhaul of induced-draft fans on raw mills Nos. 1 and 2, including bearing replacement and housing repairs.
PrJSC Kryvyi Rih CementKryvyi Rih plant
04
Overhaul of the handling crane, including replacement of the trolley rails.
PrJSC Kryvyi Rih CementKryvyi Rih plant
05
Overhaul of bucket conveyors Nos. 21 and 22, including replacement of the bucket-chain assemblies.
PrJSC Kryvyi Rih CementKryvyi Rih plant
06
Overhaul of the VRS-134M railcar tippler and T 16-3 railcar pusher.
PrJSC Kryvyi Rih CementKryvyi Rih plant
07
Overhaul of belt conveyors Nos. 19, 26, 202, 203, 204, 250 and 251, including conveyor belt replacement.
PrJSC Kryvyi Rih CementKryvyi Rih plant
08
Overhaul of drying drums Nos. 2 and 3, including replacement of the tyre support pack assemblies.
PrJSC Kryvyi Rih CementKryvyi Rih plant
09
Overhaul of raw mill No. 2, including welding and heat treatment of a shell crack.
PrJSC Kryvyi Rih CementKryvyi Rih plant
10
Overhaul of electric motors АКНЗ-2-15-69-6УЗ, 1,250 kW, and СМ СДМЗ-2-22-41-60У4, 2,000 kW.
PrJSC Kryvyi Rih CementKryvyi Rih plant
11
Replacement of the discharge gas duct on raw mill No. 2, diameter 1,200 mm.
PrJSC Kryvyi Rih CementKryvyi Rih plant
12
Overhaul of the BW-G800-360-4 bucket elevator serving the kiln cyclone preheater.
PrJSC Kryvyi Rih CementKryvyi Rih plant
13
Overhaul of the kiln induced-draft fan, impeller diameter 3,530 mm.
PrJSC Kryvyi Rih CementKryvyi Rih plant
14
Overhaul of the kiln electrostatic precipitator, model УГ 3-3-88.
PrJSC Kryvyi Rih CementKryvyi Rih plant
15
Overhaul of the kiln cold gas cleaning bag filter, model LJP29147-2x8.
PrJSC Kryvyi Rih CementKryvyi Rih plant
16
Reconstruction and installation of an AUMUND bucket conveyor.
PrJSC Kryvyi Rih CementKamianske plant
201901 project
№EQUIPMENT & SCOPE OF WORKCLIENT
01
Overhaul of cement mill No. 1, including replacement of the wear-resistant lining.