25 completed assignments at PrJSC Kryvyi Rih Cement plants, documented between 2019 and 2021.

25projects in our portfolio
COMPLETED WORK / 2019—2021
201901
202015
202109
202109 projects
EQUIPMENT & SCOPE OF WORKCLIENT
17

Replacement of crane runway rails at the outdoor raw material storage yard.

PrJSC Kryvyi Rih CementKryvyi Rih plant

18

Replacement of crane runway rails at the combined storage facility.

PrJSC Kryvyi Rih CementKryvyi Rih plant

19

Overhaul of the VRS-134M railcar tippler and T 16-3 railcar pusher.

PrJSC Kryvyi Rih CementKryvyi Rih plant

20

Overhaul of bucket conveyors Nos. 21 and 22, including replacement of the bucket-chain assemblies.

PrJSC Kryvyi Rih CementKryvyi Rih plant

21

Overhaul of the BW-G800-360-4 bucket elevator serving the kiln cyclone preheater.

PrJSC Kryvyi Rih CementKryvyi Rih plant

22

Overhaul of the kiln induced-draft fan, impeller diameter 3,530 mm.

PrJSC Kryvyi Rih CementKryvyi Rih plant

23

Overhaul of the kiln electrostatic precipitator, model УГ 3-3-88.

PrJSC Kryvyi Rih CementKryvyi Rih plant

24

Overhaul of the kiln cold gas cleaning bag filter LJP29147-2x8, including replacement of filter bags.

PrJSC Kryvyi Rih CementKryvyi Rih plant

25

Refractory gunning of the 4.5 × 80 m rotary kiln, main kiln burner, clinker cooler, precalciner burner, cyclone preheater swirl chamber and 2.5 × 25 m tertiary air duct.

PrJSC Kryvyi Rih CementKryvyi Rih plant

202015 projects
EQUIPMENT & SCOPE OF WORKCLIENT
02

Overhaul of cement mill No. 3, including replacement of the tubular screw conveyor and wear-resistant lining.

PrJSC Kryvyi Rih CementKryvyi Rih plant

03

Overhaul of induced-draft fans on raw mills Nos. 1 and 2, including bearing replacement and housing repairs.

PrJSC Kryvyi Rih CementKryvyi Rih plant

04

Overhaul of the handling crane, including replacement of the trolley rails.

PrJSC Kryvyi Rih CementKryvyi Rih plant

05

Overhaul of bucket conveyors Nos. 21 and 22, including replacement of the bucket-chain assemblies.

PrJSC Kryvyi Rih CementKryvyi Rih plant

06

Overhaul of the VRS-134M railcar tippler and T 16-3 railcar pusher.

PrJSC Kryvyi Rih CementKryvyi Rih plant

07

Overhaul of belt conveyors Nos. 19, 26, 202, 203, 204, 250 and 251, including conveyor belt replacement.

PrJSC Kryvyi Rih CementKryvyi Rih plant

08

Overhaul of drying drums Nos. 2 and 3, including replacement of the tyre support pack assemblies.

PrJSC Kryvyi Rih CementKryvyi Rih plant

09

Overhaul of raw mill No. 2, including welding and heat treatment of a shell crack.

PrJSC Kryvyi Rih CementKryvyi Rih plant

10

Overhaul of electric motors АКНЗ-2-15-69-6УЗ, 1,250 kW, and СМ СДМЗ-2-22-41-60У4, 2,000 kW.

PrJSC Kryvyi Rih CementKryvyi Rih plant

11

Replacement of the discharge gas duct on raw mill No. 2, diameter 1,200 mm.

PrJSC Kryvyi Rih CementKryvyi Rih plant

12

Overhaul of the BW-G800-360-4 bucket elevator serving the kiln cyclone preheater.

PrJSC Kryvyi Rih CementKryvyi Rih plant

13

Overhaul of the kiln induced-draft fan, impeller diameter 3,530 mm.

PrJSC Kryvyi Rih CementKryvyi Rih plant

14

Overhaul of the kiln electrostatic precipitator, model УГ 3-3-88.

PrJSC Kryvyi Rih CementKryvyi Rih plant

15

Overhaul of the kiln cold gas cleaning bag filter, model LJP29147-2x8.

PrJSC Kryvyi Rih CementKryvyi Rih plant

16

Reconstruction and installation of an AUMUND bucket conveyor.

PrJSC Kryvyi Rih CementKamianske plant

201901 project
EQUIPMENT & SCOPE OF WORKCLIENT
01

Overhaul of cement mill No. 1, including replacement of the wear-resistant lining.

PrJSC Kryvyi Rih CementKryvyi Rih plant